On April 2nd, emergency dredging began at the Oregon Inlet channel. An underwater survey on March 27th showed the channel with a depth of less than two feet seaward of the Bonner Bridge. Today, on the Down East Journal, I speak with Chief of Physical Support Branch with the Army Corp of Engineers Wilmington District Donnie Potter who says the dredging project is on track, despite a delayed start.